LLMs and Agility: Why Pit Them Against Each Other?
Just because we develop faster, does that mean we no longer need Agility? This idea betrays a misunderstanding of what Agility is.
Just because we develop faster, does that mean we no longer need Agility? This idea betrays a misunderstanding of what Agility is.
The problem is that the benchmark (Waterfall) leads to software that doesn’t meet users’ needs…
Don’t ask, “How long will this take?” Instead, ask yourself if you can break your work down into even smaller pieces.
Some MVPs cost 10,000 euros; others, 10 million euros. The goal is the same—to acquire real users—but it all depends on the market.
To bring about lasting change, it’s better to persuade than to order. However, this change takes time and requires self-directed individuals.
User Story or technical task? Behind a battle of words lies the trade-off between today’s value and tomorrow’s.
When “users” are mistreated by a company in a monopoly position, there is cause to start a competing business.
"It’s good to learn from your mistakes. It’s better to learn from the mistakes of others." Warren Buffett is talking about investing; I’m talking about sprints.
Sequential methodologies do not work for business IT, primarily because of the tunnel effect. The alternative? Agility.
If you had to keep just one thing from Agility, keep the retrospective. As a forum for continuous improvement, it paves the way for problem-solving.
ADR helps streamline a team’s architectural decisions and prevents them from being constantly called into question.
Agility is the art of “how,” Product Management that of “what.” One without the other is pointless: they are two sides of the same coin.
“Lean is not a production system; it’s a learning system”: that line gave me the foothold I needed to grok Lean.
The Walking Skeleton aims to lay a solid foundation for reaching the MVP while minimizing technical debt. It’s a step worth formalizing.
It would be a mistake to believe that functional design is the sole responsibility of the PM: we think more clearly when working together and using concrete examples.
Trunk-Based Development, which stems directly from Extreme Programming, is an excellent alternative to GitFlow, but be sure to thoroughly review the prerequisites.
A POC validates a marketing or technical idea, while an MVP aims to acquire your first users.
A project exists because we envision a goal to be achieved. A product has no end and evolves based on user feedback.
My main criticism of Scrum is that it says nothing about functional design. If you want it to work, it’s up to you to fill in the gaps.
"As a user, I want to connect to the database, so that I’m connected to the database." Great, or not: we have to be able to do better than that.
Rather than making estimates—which are as accurate as a broken clock (which is right twice a day)—break your work down into smaller tasks.
As agility has become more widespread, it has been misused, becoming synonymous with micromanagement and absurd practices. Yet we need agility now more than ever.